COMPANY PROJECTS: DETAILED DESCRIPTION OF WORK PERFORMED

boviar gaz

РЕАЛІЗОВАНІ ПРОЄКТИ КОМПАНІЇ ДЕТАЛЬНИЙ опис виконаних РОБІТ

boviar gaz

GRAIN DRYER

One of BoviarGaz's first projects of 2021: Installation completed:

    All

    LOCATION: Chernivtsi Oblast, Ukraine

    DURATION: 1 week

WORK PERFORMED:

    A 5-cubic-meter underground tank has been installed

    Kagla evaporator, manufactured in Japan, with a capacity of 100 kg/hour of liquefied gas

    A 700-kW mobile grain dryer has been connected.

GRAIN DRYER

The grain dryer in Skola was connected to the gas supply in mid-2022. The following installation work was completed:

    All

    LOCATION: Chernihiv Oblast

    TERMS: 14 days

WORK PERFORMED:

    A 10-cubic-meter above-ground tank has been installed

    2 Kagla evaporators with a capacity of 300 kg/hour

    A grain dryer with a capacity of 7,700 kW.

GRAIN DRYER

A liquefied gas supply system was installed for two grain dryers—the DSP-32 models—in 2021–2022. The following installation work was completed:

    All

    LOCATION: Kirovohrad Oblast

    DURATION: 2 weeks

WORK PERFORMED:

    A 15-cubic-meter underground tank has been installed

    A Japanese-made Kagla evaporator with a capacity of 300 kg/hour of liquefied gas

    A 7,000-kilowatt grain dryer has been installed.

GRAIN DRYER

One of the three grain dryers at a large grain elevator was converted to natural gas in 2022. The following installation work was completed:

    All

    LOCATION: Kyiv Oblast, Ukraine

    DURATION: 2 weeks

WORK PERFORMED:

    Two underground tanks, each with a capacity of 50 cubic meters, have been installed

    Kagla evaporators manufactured in Japan with a capacity of 300 kg/hour of liquefied gas—1 unit; 200 kg/hour—1 unit; 150 kg/hour—2 units.

    One grain dryer with a capacity of 12,500 kW.

BITUMEN PLANT

Installation of an autonomous system at a mobile concrete plant in 2022. The following installation work was completed:

    All

    LOCATION: Kharkiv Oblast, Ukraine

    DURATION: 2 weeks

WORK PERFORMED:

    A 5-cubic-meter above-ground tank has been installed

    Випарник Японського виробництва Kagla продуктивністю 100 кг/ год скрапленого газуKagla evaporator, manufactured in Japan, with a capacity of 100 kg/hour of liquefied gas

    The oil heater has a power rating of 1,600 kW.

BOILER ROOM

Installation of a liquefied petroleum gas boiler room for a company that relocated to Western Ukraine after the outbreak of full-scale war. The following installation work was completed:

    All

    LOCATION: Kalush, Ivano-Frankivsk Oblast

    TIME FRAME: 5 days

WORK PERFORMED:

    An above-ground tank has been installed

    Kagla evaporator, manufactured in Japan, with a capacity of 45 kg/hour

    A 600-kW boiler room.

POULTRY FARM

Installation of a liquefied petroleum gas supply system for a poultry farm in 2023. The following installation work was completed:

    All

    LOCATION: Rivne Oblast, Ukraine

    DURATION: 3 weeks

WORK PERFORMED:

    A 15-cubic-meter tank has been installed

    Kagla evaporator, manufactured in Japan, with a capacity of 100 kg/hour of liquefied gas

    800-kW heat guns.

GRAIN DRYER

Quick installation of an autonomous liquefied petroleum gas (LPG) supply system in 2022. Two LPG burners were connected as an alternative to natural gas. The following installation work was completed:

    All

    LOCATION: Kyiv Oblast, Ukraine

    DURATION: 3 weeks

WORK PERFORMED:

    A 5-cubic-meter above-ground tank has been installed

    Two Japanese-made Kagla evaporators with a capacity of 300 kg/hour and one with a capacity of 200 kg/hour.

    Burners with a capacity of 8,500 kW have been connected.

STEEL STRUCTURES FACTORY

Installation of a liquefied petroleum gas supply system for a poultry farm in 2023. The following installation work was completed:

    All

    LOCATION: Rivne Oblast, Ukraine

    DURATION: 3 weeks

WORK PERFORMED:

    A 15-cubic-meter tank has been installed

    Kagla evaporator, manufactured in Japan, with a capacity of 100 kg/hour of liquefied gas

    Теплові пушки потужністю 800 кВт.

Natural Gas Connection for a Private Home

Natural gas connection for a private home, completed just before New Year's 2022. The following installation work was completed:

    All

    LOCATION: Kyiv Oblast, Ukraine

    DURATION: 1 day

WORK PERFORMED:

    Installed: 5 m³ underground tank

    20 kW generator.

ELEVATOR

Turnkey installation of an autonomous gas supply system for a grain elevator belonging to one of Ukraine’s largest agricultural holdings in 2023. The following installation work was completed:

    All

    LOCATION: Vinnytsia Oblast, Ukraine

    DURATION: 1.5 months

WORK PERFORMED:

    Four 50-cubic-meter above-ground tanks have been installed

    Five Japanese-made Kagla evaporators with a capacity of 500 kg/hour

    Pump unit and pressure-reducing station with metering unit

    Two grain dryers with a total capacity of 45,000 kW have been connected.

GRAIN DRYER

A grain dryer using liquefied petroleum gas was converted to natural gas in 2024. The following installation work was completed:

    All

    LOCATION: Vinnytsia Oblast, Ukraine

    DURATION: 7 days

WORK PERFORMED:

    A 15-cubic-meter underground tank has been installed.

GLASS FACTORY

Turnkey installation of an autonomous gas supply system for a glass factory. The following installation work was performed:

    All

    LOCATION: Kyiv Oblast, Ukraine

    DURATION: 1.5 months

WORK PERFORMED:

    Four 25-cubic-meter underground tanks have been installed

    A Japanese-made Kagla evaporator with a capacity of 1,500 kg/hour has been installed

    The pump unit and pressure-reducing station, including the metering unit, have been installed.

Contact Us

If you would like to schedule a consultation or ask a question, please contact us in any way that is convenient for you:

Address:

Kyiv, 5 Zhmerynska St., Office 20


Hours:

Monday–Friday: 8:00 AM–6:00 PM

Contact Information: